BIM 5D service integrates both cost information and time information (4D) into the Building Information Modeling (BIM) 3D model, aiding in project cost management and prediction. Below are the basic steps involved in executing this service:
-
Information Gathering: Collect information about the project's design, construction schedule, and cost factors from stakeholders, including technical drawings, specifications, construction schedules, material lists, material and labor prices, and other requirements.
-
Create a BIM 3D Model: Utilize BIM tools to develop a BIM 3D model of the project, encompassing all architectural elements, structures, and MEP systems.
-
Identify Work Items and Materials: Analyze the BIM 3D model to identify and assign specific work items and corresponding materials for each part of the project.
-
Determine Cost Factors: Identify and assign costs for each work item and material in the BIM 3D model, including labor and material costs, equipment costs, transportation costs, and other related expenses.
-
Integrate Cost Information: Integrate cost information into the BIM 3D model by assigning values to each work item and material. This enables the model to display the estimated total project cost.
-
Analyze and Optimize Costs: Analyze costs in the BIM 5D model to identify opportunities for cost optimization, waste reduction, and increased economic efficiency of the project.
-
Perform Risk Assessment: Evaluate risks and the impact of unforeseen factors on project costs, implementing preventive measures and adjustments as necessary.
-
Generate Reports and Visual Graphics: Produce reports and visual graphics from the BIM 5D model to present and exchange information with stakeholders, helping them better understand the projected project costs and the factors influencing them.